Infrastructure
We have developed a sophisticated infrastructural facility that is segregated into various sections such as manufacturing unit, quality-testing unit, warehousing unit and others. Some more details regarding our infrastructural facility is given below: |
Production Process (Absorbent Cotton Wool)
 |
Our production process of absorbent cotton wool involves the following procedures:
The virgin raw cotton is opened and fed into the Vertical Opener
The cotton is loosened and foreign materials like leaf bits, stems, seeds etc., are removed
The cotton is then steam boiled in the presence of Caustic Soda, Hydrogen Peroxide, Organic Stabilizer and some auxiliary chemicals
This process removes the natural waxes and other oils from the cotton, by which the cotton attains softness, absorbency and whiteness
The wet cotton is dried in a sequence of machines like Hydroextractor, Wet Cotton Opener and Chamber Drier
The dried bleached cotton is passed through the full line of Blow Room Machine and Carding Machines to obtain a thin web
The web obtained from the carding machines are rolled and cut to sizes
The Absorbent Cotton Rolls are packed in a primary poly bag and then in a shipper. |
 |
 
Production Facility
 |
Our state-of-the-art manufacturing unit is well equipped with latest and sophisticated machinery. We have integrated the Current Good Manufacturing Practices (cGMP) in our production facility that enhances our production capacity of 60 tons per month. All the equipments installed in this unit are custom designed to meet the stringent quality norms. Our main infrastructure is well constructed and designed as per the GMP norms and standards.
The overall production and packing are undertaken in controlled and hygiene environment. For maintenance of building & machinery, safety & good house keeping, Standard Operating Procedures have been formulated and followed by us.
The different units in our infrastructure include:
In-house design unit
Backup Power Unit
Water Softener
Steam Boiler
Mechanical and Electrical Workshop
Besides, we have a separate packing area, and clean & hygienic working area. We have even incorporated a full-fledged effluent treatment plant for cleaning of discharge water that can be used for irrigating and gardening purpose. |
 |
 
|
|